Cityzen were employed buy Lomax Design and there client Southern Housing to put together a tender package
Client

Southdown

Services

Develop the Planning drawings for tender and Create an NBS

Team

MDA Consulting (QS and PM), QED (Structures), Delta Green (M&E) and Tenos (Fire Engineering)

Contractors

TBC

Total build cost

£ TBC

We worked with our clients develop the original planning drawings from Lomax Design to generate a set of tender drawings and a specification that the QS could sent out to tender for pricing.

We worked closely with Lomax to ensure there design intent was kept and with Southdown to ensure there needs for quality and durability of products were met. we were embedded in the design team coordinating the design between the structural and M&E engineers.

The building was modeled and detailed in revit to ensure a coordinated package for the contractors, and to minimise site risks.

An NBS was created to ensure that the basis of the design was clear and no key elements were missed.

This project is out for tender currently and due to commence Q3 2023